ISO VAC 20 LNG : 20 ft LNG Iso Container

The ISO VAC 20-LNG has been designed as a standard 20ft ISO Container for the safe storage and transport of Liquefied Natural Gas (LNG)

 A new frame arrangement with Blair cor­ner cast­ings, & lock­able valve pro­tec­tion cab­i­net, con­tain­ing the valves, gauges, vac­uum check gauge con­nec­tion and a sep­a­rate doc­u­ment holder.

 This tank can also be con­fig­ured to accept cryo­genic trans­fer pumps. This tank has approvals for road, rail and sea transport.

 The tank can be pro­duced with work­ing pres­sures rang­ing from 17 bar to 24 Bar and can be used for the safe trans­port of LNG, Ethylene and Ethane. Other tank options include LIN, LOX, LAR and CO2.

 The ISO VAC 20 LNG also fea­tures high vac­uum super-insulation, stack­ing capa­bil­ity 9 units high to ISO 1496 – 3 (192,000 kg max), full set of decals (includ­ing logo's where sup­plied by cus­tomer), and var­i­ous pipe work and valve options to offer max­i­mum ver­sa­til­ity to end user and operator.

 


Specification

ISO VAC 20-LNG

17 Bar

ISO VAC 20-LNG

24 Bar

Nominal Capacity (Gross) 20,000 Ltr 20,000 Ltr
Nominal Capacity (Net) 19,000 Ltr @ 95% 19,000Ltr @ 95%
Pressure 17 Bar 24 Bar
Tare Weight KG 7875 9075
Stacking KG 192,000 192,000
Holding Time Days * 55 76

 

Materials / Specifications
Inner Jacket Stainless Steel
Outer Jacket Carbon Steel
Skid Carbon Steel
Pipe Work Tp. 316 Stainless Steel Sch. 10
Paint Specification

Shot blast SA 2.5, Zinc Rich Primer 50 Microns, Epoxy High Build 125 Microns

Polyurethane Top Coat 50 Microns.

Standard Colour : White

Custom paint specifications on request

Design Approvals** EN 13530, ADR / RID, IMDG, CSC, TIR, ISO 1496, Option ASME U / CFR
Temperature Inner Shell -196C to +50C. Outer jacket -20C to +50C
Corner Castings ISO Standard 1161 Blair BLRC20100 / 2000
Couplings Blind flanges as standard. Custom specification on request

 

* Hold times in accordance with EN 12213

** Design approvals may vary depending on options and country of operation. For details, please contact Technical Department